Question 1
(TCO 9) The deliverables from the coding, testing, and installation processes include
• the creation of a document that will consolidate the information that must be considered when implementing a physically distributed systems design.
• structured descriptions and diagrams that outline the logic contained within each DFD process.
• the code, program documentation, test scenarios and test data, results of program and system testing, user guides, user training plan, and an installation and conversion plan.
• All of the above
Question 2
(TCO 9) The process of bringing together all of the modules that comprise a program for testing purposes is referred to as
• unity testing.
• integration testing.
• system testing.
• implementation.
• stub testing.
Question 3
(TCO 9) User testing of a completed information system using simulated data refers to
• acceptance testing.
• alpha testing.
• beta testing.
• system testing.
• stub testing.
Question 4
(TCO 9) System documentation that is part of the program source code or is generated at compile time best defines
• system documentation.
• user documentation.
• internal documentation.
• external documentation.
• embedded documentation.
Question 5
(TCO 9) All of the following are types of user documentation except
• release description.
• reference guide.
• acceptance sign-off.
• entity-relationship diagrams.
• user's guide.
Question 6
(TCO 9) Which of the following consists of an exhaustive list of the system's functions and commands, usually in alphabetical order?
• Reference guide
• User's guide
• Release description
• System administrator's guide
• Programmer's guide
Question 7
(TCO 9) Changes made to a system to evolve its functionality to changing business needs or technologies is referred to as
• corrective maintenance.
• adaptive maintenance.
• preventive maintenance.
• perfective maintenance.
• environmental maintenance.
Question 8
(TCO 9) Evolving the system to add new features or improve performance best describes
• corrective maintenance.
• adaptive maintenance.
• preventive maintenance.
• perfective maintenance.
• evolutionary maintenance.
Question 9
(TCO 9) An overall test plan is developed during
• systems implementation.
• systems analysis.
• logical design.
• physical design.
• systems planning and selection.
Question 10
(TCO 9) The bringing together of all the programs that comprise a system for testing describes
• unity testing.
• integration testing.
• system testing.
• implementation.
• a project walkthrough.