Loading
  • Uploaded by

    Tutor Elce
  • Course

    FIS104
  • Pages

    10
  • Subject

    Management
  • Rating

    100%   12

Question

Group Project Information

Identify an event that requires the group to utilize the Risk Management/Business Continuity techniques discussed in class.  

The event can be either manmade or natural in origin.

Identify the two phases that will be focused upon for the project.

Prepare a plan that will address the event within the two phases identified by the group.

Prepare a written document in report form that accurately presents the items/tasks/methods utilized.

Prepare a brief power point that will be utilized in a presentation that will be done in the class.

Utilize the discussion boards created in the tab titled “Group Project”.

Share documents and links with other members of the group in the appropriate discussion board.  

There will be two grades for this project:

 

  1. Group Project will be evaluated by the professor and a grade will be awarded.
  2. Members of the group will evaluate each member of the group and provide the professor with an assessment and an appropriate grade. The scores received will be averaged and the average will be recorded as a grade.   
Top Reviews

Solution Preview

It is no surprise that one of the most populated places in the world for one of the busiest nights of the year is New Year’s Eve in Times Square, New York. During this time of year, there are close to two million people ringing in the New Year at Times Square, which is definitely an immense crowd. Since there are such high volumes of people, the way it works 

This question has been solved!
OR
OR
Back To Top
#BoostYourGrades

Want a plagiarism free solution of this question ?

EYWELCOME30
100% money back guarantee
on each order.